Time and Work
- A father can do a job as fast as his two sons working together. If one son does the job in 3 hours and the other in 6 hours, the number of hours taken by the father, to do the job alone is
-
View Hint View Answer Discuss in Forum
Work done by two sons in an hour
= 1 + 1 = 1 3 6 2
∴ Work done by father in an hour= 1 2
∴ Required time = 2 hoursCorrect Option: B
Work done by two sons in an hour
= 1 + 1 = 1 3 6 2
∴ Work done by father in an hour= 1 2
∴ Required time = 2 hours
- If 42 persons consume 144 kg of wheat in 15 days, then in how many days will 30 persons consume 45 kg of wheat ?
-
View Hint View Answer Discuss in Forum
∴ 30 : 42 : : 15 : x 144 : 48
⇒ 30 × 144 × x = 42 × 48 × 15⇒ x = 42 × 48 × 15 = 7 days 30 × 144 Correct Option: B
∴ 30 : 42 : : 15 : x 144 : 48
⇒ 30 × 144 × x = 42 × 48 × 15⇒ x = 42 × 48 × 15 = 7 days 30 × 144
- A can do as much work in 4 days as B can do in 5 days, and B can do as much work in 6 days as C in 7 days. In what time will C do a piece of work which A can do in a week ?
-
View Hint View Answer Discuss in Forum
A’s 4 days’ work = B’s 5 days’ work
⇒ A : B = 4 : 5
Again, B : C = 6 : 7
∴ A : B : C = 4 × 6 : 5 × 6 : 5 × 7 = 24 : 30 : 35
∵ Time taken by A = 7 days∴ Time taken by C = 35 × 7 24 = 245 = 10 5 days 24 24 Correct Option: A
A’s 4 days’ work = B’s 5 days’ work
⇒ A : B = 4 : 5
Again, B : C = 6 : 7
∴ A : B : C = 4 × 6 : 5 × 6 : 5 × 7 = 24 : 30 : 35
∵ Time taken by A = 7 days∴ Time taken by C = 35 × 7 24 = 245 = 10 5 days 24 24
- A and B can do a piece of work in 18 days, B and C in 24 days, A and C in 36 days. Working together they can do the work in
-
View Hint View Answer Discuss in Forum
(A + B)’s 1 day’s work = 1 18 (B + C)’s 1 day’s work = 1 24 (C + A)’s 1 day’s work = 1 36
On adding all three,
2 (A + B + C)’s 1 day’s work= 1 + 1 + 1 = 3 + 4 + 2 18 24 36 72 = 9 = 1 72 8
∴ (A + B + C)’s 1 day’s work= 1 16
∴ Required time = 16 daysCorrect Option: C
(A + B)’s 1 day’s work = 1 18 (B + C)’s 1 day’s work = 1 24 (C + A)’s 1 day’s work = 1 36
On adding all three,
2 (A + B + C)’s 1 day’s work= 1 + 1 + 1 = 3 + 4 + 2 18 24 36 72 = 9 = 1 72 8
∴ (A + B + C)’s 1 day’s work= 1 16
∴ Required time = 16 days
- A canal of a village can be cleaned by 24 villagers in 12 days. The number of days in which 36 villagers can clean the canal is
-
View Hint View Answer Discuss in Forum
M1D1 = M2D2
⇒ 24 × 12 = 36 × D2⇒ D2 = 24 × 12 = 8 days 36 Correct Option: B
M1D1 = M2D2
⇒ 24 × 12 = 36 × D2⇒ D2 = 24 × 12 = 8 days 36