  1. A and B can do a piece of work in 18 days, B and C in 24 days, A and C in 36 days. Working together they can do the work in
    1. 12 days
    2. 13 days
    3. 16 days
    4. 26 days
Correct Option: C

(A + B)’s 1 day’s work =
1
18

(B + C)’s 1 day’s work =
1
24

(C + A)’s 1 day’s work =
1
36

On adding all three,
2 (A + B + C)’s 1 day’s work
=
1
+
1
+
1
=
3 + 4 + 2
18243672

=
9
=
1
728

∴ (A + B + C)’s 1 day’s work
=
1
16

∴ Required time = 16 days