- The least important measure for reducing cost of site development is
-
View Hint View Answer Discuss in Forum
Villa Savoye is a modernistvilla on the outskirts of Paris, France. It was designed by the SwissarchitectsLe Corbusier and his cousin, Pierre Jeanneret, and built between 1928 and 1931 using reinforced concrete. As an exemplar of Le Corbusier's "five points" for new constructions, the villa is representative of the origins of modern architecture, and is one of the most easily recognizable and renowned examples of the International style. The house was originally built as a country retreat for the Savoye family. In July 2016, the house and several other works by Le Corbusier were registered as UNESCO World Heritage Sites.
Correct Option: A
Villa Savoye is a modernistvilla on the outskirts of Paris, France. It was designed by the SwissarchitectsLe Corbusier and his cousin, Pierre Jeanneret, and built between 1928 and 1931 using reinforced concrete. As an exemplar of Le Corbusier's "five points" for new constructions, the villa is representative of the origins of modern architecture, and is one of the most easily recognizable and renowned examples of the International style. The house was originally built as a country retreat for the Savoye family. In July 2016, the house and several other works by Le Corbusier were registered as UNESCO World Heritage Sites.
- ‘Villa Savoye’, Paris is an example of
-
View Hint View Answer Discuss in Forum
It is an example of Modernism.
Correct Option: A
It is an example of Modernism.
- Match the AutoCAD command in Group I with their functions in Group II
Group I Group II P. OOPS 1. Creates solid lines Q. RAY 2. Restores an erased drawing R. TRACE 3. Manages customized user interface elements S. CUI 4. Creates semi-infinite line 5. Creates a five sided 3D solid with a sloped face tapering along the X axis
-
View Hint View Answer Discuss in Forum
NA
Correct Option: B
NA
- At a site, based on percolation test, the allowable rate of treated sewage application was determined as 65 L/m&up2; /day. The effective depth (m) of a soak pit with a diameter of 2.5 m for the disposal of 1020 L/day of septic tank effluent is _________
-
View Hint View Answer Discuss in Forum
At a site, based on percolation test, the allowable rate of treated sewage application was determined as 65 L/m² /day. The effective depth (m) of a soak pit with a diameter of 2.5 m for the disposal of 1020 L/day of septic tank effluent is 1.98.
Correct Option: A
At a site, based on percolation test, the allowable rate of treated sewage application was determined as 65 L/m² /day. The effective depth (m) of a soak pit with a diameter of 2.5 m for the disposal of 1020 L/day of septic tank effluent is 1.98.
- Hiroshima Peace Memorial Museum in Japan has been designed by
-
View Hint View Answer Discuss in Forum
The Hiroshima Peace Memorial Museum lies within the Peace Memorial Park close to the hypocenter of the bomb. The East Building shows a history of H ir oshima before and after the bombing, and the West Building exhibits articles left by the victims, a-bomb-exposed materials, and photographs. The primary objective and mission of the Hiroshima Peace Memorial Museum are the same as those of the museum in the city of Hiroshima: the abolition of nuclear weapons and the realization of genuine and lasting world peace.
Correct Option: A
The Hiroshima Peace Memorial Museum lies within the Peace Memorial Park close to the hypocenter of the bomb. The East Building shows a history of H ir oshima before and after the bombing, and the West Building exhibits articles left by the victims, a-bomb-exposed materials, and photographs. The primary objective and mission of the Hiroshima Peace Memorial Museum are the same as those of the museum in the city of Hiroshima: the abolition of nuclear weapons and the realization of genuine and lasting world peace.