A and B can do a work in 18 and 24 days respectively. They worked together for 8 days and then A left. The remaining work was finished by B in :
-
- 5 days
-
5 1 days 3 - 8 days
- 10 days
Correct Option: B
∵ A can finish the work in 18 days
∴ A’s one day’s' work
= | 18 |
Similarly, B’s one day’s work
= | 24 |
∴ (A + B)’s 8 days’ work
= | + | × 8 | 18 | 24 |
= | × 8 = | |||
72 | 9 |
∴ Remaining work = 1 - | = | |||
9 | 9 |
∴ Time taken to finish the remaining work by B is
× 24 | 9 |
× 24 | 9 |
Aliter : Using Rule 20,
Here, m = 18, n= 24 and p = 8
⇒ Required Time
= | 18 |
= | = | |||
18 | 18 |
= | = 5 | days | ||
3 | 3 |