  1. A and B can do a work in 18 and 24 days respectively. They worked together for 8 days and then A left. The remaining work was finished by B in :
    1. 5 days
    2. 5
      1
      days
      3
    3. 8 days
    4. 10 days
Correct Option: B

∵ A can finish the work in 18 days
∴ A’s one day’s' work

=
1
18

Similarly, B’s one day’s work
=
1
24

∴ (A + B)’s 8 days’ work
=
1
+
1
× 8
1824

=
7
× 8 =
7
729

∴ Remaining work = 1 -
7
=
2
99

∴ Time taken to finish the remaining work by B is
2
× 24
9

2
× 24
9

Aliter : Using Rule 20,
Here, m = 18, n= 24 and p = 8
⇒ Required Time
=
18 × 24 - 8(18 + 24)
18

=
432 - 336
=
96
1818

=
16
= 5
1
days