  1. 3 men and 4 boys can complete a piece of work in 12 days. 4 men and 3 boys can do the same work in 10 days. Then 2 men and 3 boys can finish the work in
    1. 17
      1
      days
      2
    2. 5
      5
      days
      11
    3. 8 days
    4. 22 days
Correct Option: A

12 (3 men + 4 boys)
≡ 10 (4 men + 3 boys)
⇒ 36 men + 48 boys = 40 men + 30 boys
⇒ 4 men = 18 boys
⇒ 2 men = 9 boys
∴ 4 men + 3 boys
= 21 boys, who do the work in 10 days and 2 men + 3 boys = 12 boys
∴ M1D1 = M2D2
⇒ 21 × 10 = 12 × D2

⇒ D2 =
21 × 10
=
35
= 17
1
days
1222

Aliter :
Using Rule 11, Here, A1 = 3, B1 = 4, D1 = 12
A2 = 4, B2 = 3, D2 = 10
A3 = 2, B3 = 3
Required time =
D1D2(A1B2 - A2B1)
days
D1(A1B3 - A3B1) - D2(A2B3 - A3B2)

=
12 × 10(3 × 3 - 4 × 4)
days
12(3 × 3 - 2 × 4) - 10(4 × 3 - 2 × 3)

=
120 × - 7
days
12(9 - 8) - 10 × 6

=
- 840
= 17
1
days
- 482