  1. A and B together can do a piece of work in 30 days, B and C together can do it in 20 days. A starts the work and works on it for 5 days, then B takes it up and works for 15 days. Finally C finishes the work in 18 days. In how many days can C do the work when doing it separately?
    1. 40 days
    2. 24 days
    3. 120 days
    4. 60 days
Correct Option: B

Let us denote A’s 1 day’s work by A, B’s 1 day’s work by B and C’s work by C.

So, A + B =
1
30

and B + C =
1
20

Also, 5A + 15B + 18C = 1 work.
This can be written as,
5 (A + B) + 10 (B + C) + 8C= 1
Substituting the values of (A + B) and (B + C) we get,
=5 ×
1
+10 ×
1
+ 8C = 1
3020

or
1
+
1
+ 8C = 1
62

or 8C = 1 -
1
-
1
62

or 8C =
6 - 1 - 3
6

or 8C =
2
6

or C =
2
=
1
6 × 824

Hence, C will complete the work in 24 days.