  1. A can do a piece of work in 12 days and B in 20 days. If they together work on it for 5 days, and remaining work is completed by C in 3 days, then in how many days can C do the same work alone?
    1. 10 days
    2. 9 days
    3. 12 days
    4. 15 days
Correct Option: B

Work done by (A + B) in 5 days

= 5
1
+
1
= 5
5 + 3
152060

=
40
=
2
603

Remaining work = 1 -
2
=
1
33

∵ Time taken by C in doing
1
work = 3 days
3

∴ Required time = 3 × 3 = 9 days