-
A can do a piece of work in 12 days and B in 20 days. If they together work on it for 5 days, and remaining work is completed by C in 3 days, then in how many days can C do the same work alone?
-
- 10 days
- 9 days
- 12 days
- 15 days
Correct Option: B
Work done by (A + B) in 5 days
= 5 | + | = 5 | 15 | 20 | 60 |
= | = | |||
60 | 3 |
Remaining work = 1 - | = | |||
3 | 3 |
∵ Time taken by C in doing | work = 3 days | 3 |
∴ Required time = 3 × 3 = 9 days