-
A and B together can finish a job in 24 days, while A, B and C together can finish the same job in 8 days. C alone will finish the job in
-
- 12 days
- 14 days
- 16 days
- 24 days
Correct Option: A
(A + B)’s 1 day’s work = | 24 |
(A + B + C)’s 1 day’s work = | 6 |
∴ C’s 1 day’s work = | - | |||
8 | 24 |
= | = | = | ||||
24 | 24 | 12 |
∴ Required time = 12 days