  1. A and B can do a piece of work in 72 days. B and C can do it in 120 days and A and C can do it in 90 days. A alone can do it in :
    1. 120 days
    2. 130 days
    3. 150 days
    4. 100 days
Correct Option: A

(A + B)’s 1 day’s work

=
1
...........(i)
72

(B + C)’s 1 day’s work
=
1
...........(ii)
120

(C + A)’s 1 day’s work
=
1
...........(iii)
90

On adding all three,
2 (A + B + C)’s 1 day’s work
=
1
+
1
+
1
7212090

=
5 + 3 + 4
=
12
=
1
36036030

∴ (A + B + C)’s 1 day’s work
=
1
...........(iv)
60

∴ A’s 1 day’s work
= Equation (iv) – (ii),
=
1
-
1
=
2 - 1
=
1
60120120120

∴ Required time = 120 days