-
A can finish a work in 24 days, B in 9 days and C in 12 days. B and C start the work but are forced to leave after 3 days. The remaining work was done by A in :
-
- 5 days
- 6 days
- 10 days
-
10 1 days 2
Correct Option: C
Work done by (B + C) in 3 days.
= 3 × | + | 9 | 12 |
= | + | = | = | |||||
3 | 4 | 12 | 12 |
Remaining work = 1 - | = | |||
12 | 12 |
This part of work is done by A alone.
Now, | part of work is done by A in 1 day | 24 |
∴ | part of work will be done by | 12 |
A in = 24 × | = 10 days. | 12 |