Home » Aptitude » Time and Work » Question
  1. A certain number of men complete a piece of work in 60 days. If there were 8 men more, the work could be finished in 10 days less. The number of men originally was
    1. 30
    2. 40
    3. 32
    4. 36
Correct Option: B

Number of men originally = x (let)
∴ M1 D1 = M2 D2
⇒ x × 60 = (x + 8) × 50
⇒ 6x = 5x + 40
⇒ 6x – 5x = 40
⇒ x = 40 men
Aliter : Using Rule 23,
Here, D= 60, a = 8, d =10

∴ Required number=
a(D - d)
d

=
8(60 - 10)
= 40
10