15 men can finish a piece of work in 40 days. The number of days after which 5 men should leave the work so that the work is finished in 45 days altogether is :
-
- 10
- 20
- 30
- 35
Correct Option: C
Let 5 men leave the work after x days.
∵ M1D1 = M2D2 + M3D3
∴ 15 × 40 = 15 × x + 10 × (45 – x)
⇒ 600 = 15x + 450 – 10x
⇒ 600 – 450 = 5x Þ 5x = 150
⇒ x = | 30 days | |
5 |