  1. A skilled, a half skilled and an unskilled labourer work for 7, 8 and 10 days respectively and they together get 369 for their work. If the ratio of their each day’s work is
    1
    :
    1
    :
    1
    346

    then how much does the trained labourer get (in rupees) ?
    1. 164
    2. 102.50
    3. 201.50
    4. 143.50
Correct Option: D

Using Rule 25,
Skilled : half skilled : unskilled

=
1
:
1
:
1
346

=
1
× 12:
1
× 12:
1
× 12= 4 : 3 : 2
346

Share of the trained labourer
=
28
× 369
(7 × 4 + 8 × 3 + 2 × 10)

=
28
× 369
(28 + 24 + 20)

=
28
× 369 = ₹ 143.50