A skilled, a half skilled and an unskilled labourer work for 7, 8 and 10 days respectively and they together get 369 for their work. If the ratio of their each day’s work is
1 : 1 : 1 3 4 6
then how much does the trained labourer get (in rupees) ?
-
- 164
- 102.50
- 201.50
- 143.50
Correct Option: D
Using Rule 25,
Skilled : half skilled : unskilled
= | : | : | ||||
3 | 4 | 6 |
= | × 12 | : | × 12 | : | × 12 | = 4 : 3 : 2 | 3 | 4 | 6 |
Share of the trained labourer
= | × 369 | (7 × 4 + 8 × 3 + 2 × 10) |
= | × 369 | (28 + 24 + 20) |
= | × 369 = ₹ 143.50 | 72 |