  1. A and B can complete a piece of work in 45 and 40 days respectively. Both started to work together, but after some days A left and B alone completed the rest work in 23 days. For how many days did A work?
    1. 12 days
    2. 10 days
    3. 8 days
    4. 9 days
Correct Option: D

Using Rule 2,
Let A worked for x days.

A’s 1 day’s work =
1
45

∴ A’s x day’s work=
x
45

B’s 1 day’s work =
1
40

∴ B’s x day’s work
=
1
× x =
x
4040

(A + B) together worked for x days.
∴ (A + B)’s x day’s work
=
x
+
x
4540

=
8x + 9x
=
17x
360360

∴ Remaining work
= 1 -
17x
=
360 - 17x
360360

This part of work, i.e.,
360 - 17x
360

is completed by B alone in 23 days.
360 - 17x
= 23 × B’s 1 day’s work
360

360 - 17x
360

= 23 ×
1
=
23
4040

∴ 360 – 17x
=
23
× 360 = 207
40

∴ 17x = 360 – 207 = 153
⇒ x =
153
= 9 days
17

Hence, A worked for 9 days.