Home » Aptitude » Time and Work » Question
  1. A and B together can dig a trench in 12 days, which A alone can dig in 28 days; B alone can dig it in
    1. 20 days
    2. 21 days
    3. 22 days
    4. 23 days
Correct Option: B

B’s 1 day’s work = (A + B)’s 1 day’s work – A’s 1 day’s work

B’s 1 day’s work =
1
-
1
=
7 - 3
122884

B’s 1 day’s work =
4
=
1
8421

∴ Required time = 21 days
Second method to solve this question ,
Time taken by B =
xy
days
x - y

Time taken by B =
12 × 28
28 - 12

Time taken by B =
12 × 28
= 21 days
16