  1. In the construction of networks, dummy activities are introduced in order to









  1. View Hint View Answer Discuss in Forum

    NA

    Correct Option: C

    NA


  1. A project consists of six activities. The immediate predecessor of each activity and the estimated duration is also provided in the table below:

    If all activities other than S take the estimated amount of t i me, t he maxi mum dur at i on (in weeks) of the activity S without delaying the completion of the project is ______.









  1. View Hint View Answer Discuss in Forum

    Correct Option: A



  1. In PERT chart, the activity time distribution is









  1. View Hint View Answer Discuss in Forum

    Beta distribution extended to the Maximum & Minimum & gives strict definition for the mean & variance

    Correct Option: D

    Beta distribution extended to the Maximum & Minimum & gives strict definition for the mean & variance


  1. The standard deviation of the critical path is









  1. View Hint View Answer Discuss in Forum

    Variance =
    tp − tO
    2
    6


    Total variance =
    1
    2 +
    2
    2 +
    1
    2 +
    1
    2
    3333

    =
    7
    9

    Standard deviation = √variance
    ⇒  √7/9 = 0.88

    Correct Option: C

    Variance =
    tp − tO
    2
    6


    Total variance =
    1
    2 +
    2
    2 +
    1
    2 +
    1
    2
    3333

    =
    7
    9

    Standard deviation = √variance
    ⇒  √7/9 = 0.88



  1. The critical path duration of the network (in days) is









  1. View Hint View Answer Discuss in Forum


    EST = Earliest start time
    LFT = Latest Finish Time
    ∴  Path along which EST & LFT is equal are called critical path
    Critical path duration is 18 days.

    Correct Option: D


    EST = Earliest start time
    LFT = Latest Finish Time
    ∴  Path along which EST & LFT is equal are called critical path
    Critical path duration is 18 days.