Industrial Engineering Miscellaneous
- The most commonly used criteria for measuring forecast error is
-
View Hint View Answer Discuss in Forum
NA
Correct Option: A
NA
- Which one of the following forecasting techniques is not suited for making forecasts for planning Production schedules in the short range?
-
View Hint View Answer Discuss in Forum
NA
Correct Option: D
NA
- Which of the following is a technique for forecasting?
-
View Hint View Answer Discuss in Forum
NA
Correct Option: A
NA
- In a forecasting model, at the end of period 13, the forecasted value for period 14 is 75. Actual value in the periods 14 to 16 are constant at 100. If the assumed simple exponential smoothing parameter is 0.5, then the MSE at the end of period 16 is
-
View Hint View Answer Discuss in Forum
F14 = 75, D14 = 100
F15 = F14 + α(D14 – F14)
= 75 + 0.5 (100.75)
F15 = 87.5
D15 = 100
F16 = 87.5 + 0.5 (100 – 87.5)
F16 = 93.75MSE = ∑ei² n
Where ei = Di - FiMSE = (100 - 75)² + (100 - 87.5)² + (100 - 93.75)² = 273.44 3
Correct Option: B
F14 = 75, D14 = 100
F15 = F14 + α(D14 – F14)
= 75 + 0.5 (100.75)
F15 = 87.5
D15 = 100
F16 = 87.5 + 0.5 (100 – 87.5)
F16 = 93.75MSE = ∑ei² n
Where ei = Di - FiMSE = (100 - 75)² + (100 - 87.5)² + (100 - 93.75)² = 273.44 3
- One of the following statements about PRS (Periodic Reordering System) is not true identify.
-
View Hint View Answer Discuss in Forum
NA
Correct Option: C
NA