-
A and B together can do a piece of work in 6 days. If A can alone do the work in 18 days, then the number of days required for B to finish the work is
-
- 10
- 12
- 9
- 15
Correct Option: C
(A + B)’s 1 day’s work = | 6 |
A’s 1 day’s work = | 18 |
∴ B’s 1 day’s work = | - | |||
6 | 18 |
= | = | = | ||||
18 | 18 | 9 |
∴ Required time = 9 days
Aliter : Using Rule 4,
Time taken by B = | days | x - y |
= | = 9 days | 18 - 6 |