  1. A and B can do a given piece of work in 8 days, B and C can do the same work in 12 days and A, B, C complete it in 6 days. Number of days required to finish the work by A and C is
    1. 16
    2. 8
    3. 12
    4. 24
Correct Option: B

(A + B)’s 1 day’s work =
1
8

(B + C)’s 1 day’s work =
1
12

(A + B + C)’s 1 day’s work =
1
6

∴ C’s 1 day’s work =
1
-
1
68

=
4 - 3
=
1
2424

A’s 1 day’s work
=
1
-
1
=
2 - 1
=
1
6121212

∴ (A + C)’s 1 day’s work
=
1
+
1
=
2 + 1
=
1
1224248

∴ Required time = 8 days
Aliter : Using Rule 5,
Let the time taken by A and C is x days
⇒ 6 =
2 × x × 8 × 12
8x + 96 + 12x

6 =
x × 192
20x + 96

120x + 576 = 192x
72x = 576
x = 8 days