-
If 6 men and 8 boys can do a piece of work in 10 days and 26 men and 48 boys can do the same in 2 days, then the time taken by 15 men and 20 boys to do the same type of work will be :
-
- 5 days
- 4 days
- 6 days
- 7 days
Correct Option: B
According to question,
(6M + 8B) × 10 = (26M + 48B) × 2
∴ 60M + 80B = 52M + 96B
or, 1M = 2B
∴ 15M + 20B = (30 + 20)B
= 50 boys and 6M + 8B
= (12 + 8) boys = 20 boys
∵ 20 boys can finish the work in 10 days
∴ 50 boys can finish the work in
days = 4 days | 50 |
Aliter : Using Rule 11,
A1 = 6, B1 = 8, D1 = 10
A2 = 26, B2 = 48, D2 = 2
A3 = 15, B3 = 20
Required time
= | days | D1(A1B3 - A3B1) - D2(A2B3 - A3B2) |
= | days | 10(6 × 20 - 15 × 8) - 2(26 × 20 - 15 × 48) |
= | 10(120 - 120) - 2(520 - 720) |
= | = 4 days | 400 |