-
A can do a work in 15 days and B in 20 days.If they together work on it for 4 days, then the fraction of the work that is left is:
-
-
8 15 -
7 15 -
1 4 -
1 10
-
Correct Option: A
Using basics of Rule 2,
A’s work per da = | 15 |
B’s work per day = | 20 |
(A+ B)’s work per day
= | + | = | = | |||||
15 | 20 | 60 | 60 |
∴ (A + B)’s work in 4 days
= 4 × | = | |||
60 | 15 |
Left work = 1 - | 15 |
= | = | |||
15 | 15 |