  1. A and B work together to complete the rest of a job in 7 days.However, 37/100 of the job was already done. Also, the work done by A in 5 days is equal to the work done by B in 4 days. How many days would be required by the fastest worker to complete the entire work?
    1. 20
    2. 25
    3. 30
    4. 10
Correct Option: A

Remaining work

= 1 –
37
100

=
100 - 37
=
63
100100

∴ Time taken by (A + B) in doing
63
part of work = 7 days
100

∴ Time taken by them in doing whole work
=
100
× 7
63

=
100
days
9

Respective ratio of time taken by
A and B in doing the work = 5 : 4
1
+
1
=
9
4x5x100

5 + 4
=
9
20x100

⇒ 20x = 100 ⇒ x = 5
∴ Required time
= 4 × 5 = 20 days