A PHP Error was encountered

Severity: Warning

Message: fopen(/var/lib/php/sessions/ci_session565d6lfka5lbfkf11cilbjo6hrdr0uim): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 176

Backtrace:

File: /var/www/interviewmania.com/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: session_start(): Failed to read session data: user (path: /var/lib/php/sessions)

Filename: Session/Session.php

Line Number: 143

Backtrace:

File: /var/www/interviewmania.com/index.php
Line: 315
Function: require_once

A can do a certain job in 12 days. B is 60% more efficient

Home » Aptitude » Time and Work » Question
  1. A can do a certain job in 12 days. B is 60% more efficient than A. To do the same job B alone would take :
    1. 7
      1
      days
      2
    2. 8 days
    3. 10 days
    4. 7 days
Correct Option: A

Time taken by B
= 12 ×
100
=
15
= 7
1
16022

Aliter : Using Rule 17,
Here, x = 12, R = 60%
Time taken by B
= x ×
100
days
100 + R

= 12 ×
100
days
160

=
15
= 7
1
days
22