A work could be completed in 100 days by some workers. However, due to the absence of 10 workers, it was completed in 110 days. The original number of workers was :
-
- 100
- 110
- 55
- 50
Correct Option: B
Let the original number of
workers = x. Then,
x × 100 = (x – 10) × 110
⇒ 10x = 11x – 110
⇒ x = 110
Aliter : Using Rule 23,
Here, D = 100, a = 10,
d = (110 - 100) = 10
Required number
= | d |
= | = 110 | 10 |