Home » Aptitude » Time and Work » Question
  1. The four walls and ceiling of a room of length 25 m, breadth 12 m and height 10 m are to be painted. Painter A can paint 200 m2 in 5 days, Painter B can paint 250 m2 in 2 days. If A and B work together, they will finish the job in
    1. 6 days
    2. 6
      10
      days
      33
    3. 7
      10
      days
      33
    4. 8 days
Correct Option: B

Area of the four walls and ceiling of the room
= 2h (l + b) + lb
= 2 × 10 (25 + 12) + 25 × 12
= (20 × 37 + 300) sq. metre
= (740 + 300) sq. metre
= 1040 sq. metre
Area painted by A in 1 day

=
200
= 40 sq. metre
5

Area painted by B in 1 day
=
250
= 125 sq. metre
2

Area painted by both in1 day
= (125 + 40) sq. metre
= 165 sq. metre
∴ Required time =
1040
165

=
208
= 6
10
days
3333



Your comments will be displayed only after manual approval.