- The height of the down sprue is 175 mm and its CS are at the base is 200 mm². The CS area of the horizontal runner is also 200 mm². Assuming no losses, indicate the correct choice for-the time (second) required to fill a mould cavity of volume 106mm3. (Use g = 10 m/s²)
-
View Hint View Answer Discuss in Forum
Vs = √2 × 10 × 175 × 10−3
= 1870 mm/s
Pouring timet = 106 200 × 1870
t = 2.67 m/sCorrect Option: C
Vs = √2 × 10 × 175 × 10−3
= 1870 mm/s
Pouring timet = 106 200 × 1870
t = 2.67 m/s
- According to Chvorinov's rule, the solidification time of a casting is proportional to (Volume/ surface area)n, where 'n' equals to
-
View Hint View Answer Discuss in Forum
t = k V 2 A
n = 2Correct Option: C
t = k V 2 A
n = 2
- Application
A. Undercut in components
B. Large bells
C. Mass production of casting by machine moulding
D. Components with irregular parting lines
Type of pattern
1. Cope and drag
2. Follow board
3. Gated
4. Loose piece
5. Sweep
-
View Hint View Answer Discuss in Forum
A – 4, B – 5, C – 3, D – 1
Correct Option: D
A – 4, B – 5, C – 3, D – 1
- Chaplets are placed between mould in order to
-
View Hint View Answer Discuss in Forum
NA
Correct Option: A
NA
- The primary function of a riser is to
-
View Hint View Answer Discuss in Forum
Riser is used to compensate liquid shrinkage & phase transition shrinkage.
Correct Option: C