-
The height of the down sprue is 175 mm and its CS are at the base is 200 mm². The CS area of the horizontal runner is also 200 mm². Assuming no losses, indicate the correct choice for-the time (second) required to fill a mould cavity of volume 106mm3. (Use g = 10 m/s²)
-
- 2.67
- 8.45
- 26.7
- 84.50
Correct Option: C
Vs = √2 × 10 × 175 × 10−3
= 1870 mm/s
Pouring time
t = | |
200 × 1870 |
t = 2.67 m/s