    The Sabaraigiri project is located in 48 km from Pathanamthitta district, through tea estates and thick forest is the famous Hydro Electric Project called Sabaraigiri. This is constructed across the many mountains rivers and the water collected in reservoir passed through huge tunnels to a main reservoir at place Anamudi and from through large pipes to the Muziyoor powerhouse.

    Correct Option: D

    The Sabaraigiri project is located in 48 km from Pathanamthitta district, through tea estates and thick forest is the famous Hydro Electric Project called Sabaraigiri. This is constructed across the many mountains rivers and the water collected in reservoir passed through huge tunnels to a main reservoir at place Anamudi and from through large pipes to the Muziyoor powerhouse.


  1. Where is Tala Hydroelectric project, which is expected to generate 1020 MW power, located?









  1. View Hint View Answer Discuss in Forum

    Tala Hydroelectricity project is the biggest hydroelectric joint project between India and Bhutan so far, generating 4865 GWh/yr. Tala is located in Chukha Dzongkhag in western Bhutan, a small constitutional monarchy in the Himalayas. It is located on the Wangchhu River and, and is at a height of 860 metres. Tala is located in Chukha Dzongkhag in western Bhutan, a small kingdom in the Himalayas. The run-of-the-river project is being managed by Tala Hydroelectric Project Authority (THPA). It is located on the Wangchu River and, at 860m, is the region’s largest high-head project. Commissioning of the plant was planned for June 2005, but because of geological problems this was delayed until March 2007.

    Correct Option: B

    Tala Hydroelectricity project is the biggest hydroelectric joint project between India and Bhutan so far, generating 4865 GWh/yr. Tala is located in Chukha Dzongkhag in western Bhutan, a small constitutional monarchy in the Himalayas. It is located on the Wangchhu River and, and is at a height of 860 metres. Tala is located in Chukha Dzongkhag in western Bhutan, a small kingdom in the Himalayas. The run-of-the-river project is being managed by Tala Hydroelectric Project Authority (THPA). It is located on the Wangchu River and, at 860m, is the region’s largest high-head project. Commissioning of the plant was planned for June 2005, but because of geological problems this was delayed until March 2007.