Home » Industrial Engineering » Industrial Engineering Miscellaneous » Question

Industrial Engineering Miscellaneous

Industrial Engineering

  1. Processing times (including step times) and due dates for six jobs waiting to be processed at a work centres are given in the table. The average tardiness (in days) using shortest processing time rule is (correct to two decimal places).
    1. 6.33 days
    2. 5.33 days
    3. 7.33 days
    4. 9 days
Correct Option: A


Average tardiness =
Total tardiness
No. of jobs

=
3 + 3 + 10 + 22
=
38
= 6.33 days
66



Your comments will be displayed only after manual approval.