-
A welding operation is time-studied during which an operator was pace-rated as 120%. The operator took, on an average, 8 minutes for producing the weld-joint. If a total of 10% allowances are at lowed for this operation. The expected standard production rate of the weldjoint (in units per 8 hour day) is
-
- 45
- 50
- 55
- 60
Correct Option: A
Normal time = Actual Time × Rating factor
Tnormal = 8 × = | = 9.6 min | 100 |
Standard time
Tstandard = | |||
1 - | |||
100 |
= | 0.9 |
Standard Production rate
= | = 45 units | 10.67 |