  1. A welding operation is time-studied during which an operator was pace-rated as 120%. The operator took, on an average, 8 minutes for producing the weld-joint. If a total of 10% allowances are at lowed for this operation. The expected standard production rate of the weldjoint (in units per 8 hour day) is
    1. 45
    2. 50
    3. 55
    4. 60
Correct Option: A

Normal time = Actual Time × Rating factor

Tnormal = 8 × =
120
= 9.6 min
100

Standard time
Tstandard =
Tnormal
1 -
10
100

=
9.6
0.9

Standard Production rate
=
8 × 60
= 45 units
10.67