A welding operation is time-studied during which an operator was pace-rated as 120%. The operator took, on an average, 8 minutes for producing the weld-joint. If a total of 10% allowances are at lowed for this operation. The expected standard production rate of the weldjoint (in units per 8 hour day) is
-
- 45
- 50
- 55
- 60
Correct Option: A
Normal time = Actual Time × Rating factor
| Tnormal = 8 × = | = 9.6 min | 100 |
Standard time
| Tstandard = | |||
| 1 - | |||
| 100 | |||
| = | 0.9 |
Standard Production rate
| = | = 45 units | 10.67 |