Soil mechanics miscellaneous


  1. The flow net constructed for the dam is shown in the figure below. Taking the coefficient of permeability as 3.8 × 10–6 m/s, the quantity of flow (in cm3 /s) under the dam per meter of dam is __________.









  1. View Hint View Answer Discuss in Forum

    7.1 to 7.85
    No. of flow channels, Nf = 3
    No. of equipotential lines, Nd = 10
    K = 3.8 × 10–6 m/s
    H = 6.3 m

    = 3.8 × 10–6 × 6.3 ×
    3
    10

    = 7.182 × 10–6 m3 /s/m
    = 7.182 cm3 /s/m7.1 to 7.85
    No. of flow channels, Nf = 3
    No. of equipotential lines, Nd = 10
    K = 3.8 × 10–6 m/s
    H = 6.3 m
    = 3.8 × 10–6 × 6.3 ×
    3
    10

    = 7.182 × 10–6 m3 /s/m
    = 7.182 cm3 /s/m

    Correct Option: A

    7.1 to 7.85
    No. of flow channels, Nf = 3
    No. of equipotential lines, Nd = 10
    K = 3.8 × 10–6 m/s
    H = 6.3 m

    = 3.8 × 10–6 × 6.3 ×
    3
    10

    = 7.182 × 10–6 m3 /s/m
    = 7.182 cm3 /s/m


  1. The following data are given for the laboratory sample. σo' = 175 kPa; eo = 1.1; σo' + ∆σo' = 300 kPa; e = 0.9 If thickness of the clay specimen is 25 mm, the value of coefficient of volume comprehensibility is __________ × 10–4 m2 /kN.









  1. View Hint View Answer Discuss in Forum

    7.6 to 8

    Mv =
    av
    =
    ∆e / ∆σ
    1 + e01 + e0

    =
    (1.1 - 0.9)
    125 × 2.1

    = 7.61 × 10–6 m2 /kN
    H = 6.3 m

    Correct Option: D

    7.6 to 8

    Mv =
    av
    =
    ∆e / ∆σ
    1 + e01 + e0

    =
    (1.1 - 0.9)
    125 × 2.1

    = 7.61 × 10–6 m2 /kN
    H = 6.3 m



  1. A 588 cm3 volume of moist sand weighs 1010 gm. Its dry weight is 918 gm and specific gravity of solids, G is 2.67. Assuming density of water as 1 gm/cm3, the void ratio is ______









  1. View Hint View Answer Discuss in Forum

    0.71

    γd =
    Gγω
    1 + e

    γd =
    Ws
    V

    =
    918
    = 1.561g/cm³
    588

    G = 2.67, γω = 1, e = ?
    1.561 =
    2.67 × 1
    1 + e

    1 + e =
    2.67
    = 1.71
    1.561

    ∴ e = 0.71

    Correct Option: C

    0.71

    γd =
    Gγω
    1 + e

    γd =
    Ws
    V

    =
    918
    = 1.561g/cm³
    588

    G = 2.67, γω = 1, e = ?
    1.561 =
    2.67 × 1
    1 + e

    1 + e =
    2.67
    = 1.71
    1.561

    ∴ e = 0.71


Direction: The average effective overburden pressure on 10 m thick homogeneous saturated clay layer is 150 K Pa. Consolidation test on undisturbed soil sample taken from the clay layer showed that the void ratio decreased from 0.6 to 0.5 by increasing the stress intensity from 100 kPa to 200 kPa. (G = 2.65)

  1. The initial void ratio of the clay layer is









  1. View Hint View Answer Discuss in Forum

    Compression Index,

    Cc =e0 - e1
    log10
    σ1
    σ0

    =0.6 - 0.5= 0.209
    log10
    300
    100

    Take the case of e = 0.5 and σ = 300 Cc is constant.
    Cc =e0 - 0.5
    log10
    300
    150

    .209=
    e0 - 0.5
    log10(2)

    ∴ e0 = 0.563

    Correct Option: B

    Compression Index,

    Cc =e0 - e1
    log10
    σ1
    σ0

    =0.6 - 0.5= 0.209
    log10
    300
    100

    Take the case of e = 0.5 and σ = 300 Cc is constant.
    Cc =e0 - 0.5
    log10
    300
    150

    .209=
    e0 - 0.5
    log10(2)

    ∴ e0 = 0.563



Direction: The ground conditions at a site are as shown in the figure. The water table at the site which was initially at a depth of 5 m below the ground level got permanently lowered to a depth of 15 m below the ground level due to pumping of water over a few years. Assume the following data (i) unit weight of water = 10 kN/m3 .
(ii) unit weight of sand above water table = 18 kN/m3 .
(iii) unit weight of sand and clay below the water tabl = 20 kN/m3 .
(iv) coefficient of volume comprehensibility = 0.25 m2 /MN.

  1. What is the change in the effective stress in kN/m2 at mid-depth of the clay due to the lowering of the water table?









  1. View Hint View Answer Discuss in Forum

    Change in effective stress = change in water level × rw .
    = (15 – 5) × 10 = 100 kN/m2.

    Correct Option: D

    Change in effective stress = change in water level × rw .
    = (15 – 5) × 10 = 100 kN/m2.