A PHP Error was encountered

Severity: Warning

Message: fopen(/var/lib/php/sessions/ci_sessionsl8ttu44b2apf6iroqbfahcph600e1rc): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 176

Backtrace:

File: /var/www/interviewmania.com/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: session_start(): Failed to read session data: user (path: /var/lib/php/sessions)

Filename: Session/Session.php

Line Number: 143

Backtrace:

File: /var/www/interviewmania.com/index.php
Line: 315
Function: require_once

During the development of a product, an entirely new process

Home » Industrial Engineering » Industrial Engineering Miscellaneous » Question

Industrial Engineering Miscellaneous

Industrial Engineering

  1. During the development of a product, an entirely new process plan is made based on design logic, examination of geometry and tolerance information. This type of process planning is known as
    1. retrieval
    2. generative
    3. variant
    4. group technology based
Correct Option: A

NA



Your comments will be displayed only after manual approval.