Home » Industrial Engineering » Industrial Engineering Miscellaneous » Question

Industrial Engineering Miscellaneous

Industrial Engineering

  1. The total number of decision variables in the objective function of an assignment problem of size n × n{n jobs and n machines) is
    1. 2n
    2. 2n – 1
    3. n
Correct Option: A

A, n × n assignment problem, if it is solved as a LPP it will have n² variables.



Your comments will be displayed only after manual approval.