-
A 6-hour Unit Hydrograph (UH) of a catchment is triangular in shape with a total time base of 36 hours and a peak discharge of 18 m³ /s. The area of the catchment (in sq. km) is
-
- 233
- 117
- 1.2
- Sufficient information not available
Correct Option: B
Volume of run off = Area of hydrograph
= | × 18 × (36 × 60 × 60) = 1166400 m² | |
2 |
Depth of run off = 1 cm = | m | |
100 |
Area of catchment
= | × | ||
Depth of run off | (1000)² |
= | × | ≈ 117 km² | ||
1/100 | (1000)² |