Home » Materials Science and Manufacturing Engineering » Materials Science and Manufacturing Engineering Miscellaneous » Question

Materials Science and Manufacturing Engineering Miscellaneous

Materials Science and Manufacturing Engineering

  1. The figure shows a pouring arrangement for casting of a metal block. Frictional losses are negligible. The acceleration due to gravity is 9.81 m/s². The time (in s, round off to two decimal places) to fill up the mold cavity (of size 40 cm × 30 cm × 15 cm) is ____.
    1. 28.921s
    2. 28.92s
    3. 28.93s
    4. 28.90s
Correct Option: B

Mold filling time, tm =
Vm
Ag ⋅ √2gh

=
40 × 30 × 15
π(2)²
× √2 × 9.81 × 100 ×20
4

t = 28.923 sec. ≈ 28.92s



Your comments will be displayed only after manual approval.