In a pre-stressed concrete beam section shown in the figure, the net loss is 10% and the final pre-stressing force applied at X is 750 kN. The initial fiber stresses (in N/mm2 ) at the top and bottom of the beam were:
-
- 4.166 and 20.833
- – 4.166 and – 20.833
- 4.166 and –20.833
- – 4.166 and 20.833
Correct Option: D
Final force = 750 kN
Loss = 10%
∴ Initial force
= | = 833.33 kN | ||||
1 - | |||||
100 |
Top and bottom stress
= | ± | |||
A | Z |
= | × 10-3 ± | |||
250 × 400 | 250 × 4002 |
= 8.33 ± 12.5
∴ Top stress = 8.33 – 12.5 = –4.17 (tension)
Bottom stress = 8.33 + 12.5 = 20.83 (compression)