A. CNC 1. Zero inventory B. MRP 2. Rout sheet C. JIT 3. DNC D. FMS 4. Cutter path 5. Lumped demand
-
- A – 2, B – 5, C – 1, D–3.
- A – 4, B – 5, C – 1, D–2.
- A – 4, B – 5, C – 1, D–3.
- A – 4, B – 5, C – 2, D–3.
Correct Option: C
A – 4, B – 5, C – 1, D–3.
CNC - Cutter path.
MRP - Lumped demand.
JIT - Zero inventory
FMS - DNC.