-
A workpiece of 100 cm length and 30 cm width is machined by planning operation with a feed of 0.3 mm/stroke. The machine tool executes 10 double strokes per minute. The planning time for a single pass is
-
- 50 min
- 100 min
- 166.66 min
- 333.33 min
Correct Option: B
Length = 100 cm
width = 30 cm
Double stroke = 10 per /minute