  1. A generating station has a maximum demand of 20 mW, load factor of 60%, a plant capacity factor of 50% and a plant use factor of 72%. What is the reserve capacity of the plant, if the plant, while running as per schedule, were fully loaded?
    1. 10 MW
    2. 15 MW
    3. 2 MW
    4. 5 MW
Correct Option: D

Load factor =
Average demand
Maximum demand

or 0.60 =
Average demand
25

∴ Average demand = 25 × 0.60 = 15 MW
Plant capacity factor =
Average demand
Installed capacity

or 0.50 =
15
Installed capacity

∴ Installed capacity =
15
= 30 MW
0.50

Reserve capacity of the plant = Installed capacity – Maximum demand = (30 – 25) = 5 MW