Home » Power Systems » Power systems miscellaneous » Question
  1. An industrial consumer has a daily load pattern of 2000 kW, 0.8 lag for 12 Hrs. and 1000 kW UPF for 12 Hrs. The load factor is ________
    1. 0.75
    2. 75
    3. 7.5
    4. 0.0075
Correct Option: A

NA



Your comments will be displayed only after manual approval.