Home » Aptitude » Time and Work » Question
  1. 3 men or 7 women can do a piece of work in 32 days. The number of days required by 7 men and 5 women to do a piece of work twice as large is
    1. 19
    2. 21
    3. 27
    4. 36
Correct Option: B

∵ 3 men ≡ 7 women

∴ 7 men ≡
7 × 7
3

=
49
women
3

∴ 7 men + 5 women
=
49
+ 5 women
3

=
49 + 15
women
3

=
64
women
3

M1D1
=
M2D2
W1W2

=
7 × 32
=
64 × D2
13 × 2

⇒ D2 =
7 × 32 × 3 × 2
= 21 days
64

Aliter : Using Rule 12,
Here, A = 3, B = 7, a = 32
A1 = 7, B1 = 5
Required time
=
a
A1
+
B1
AB

=
32
7
+
5
37

=
32
× 21 =
21
642

They do the twice work in
21
× 2 = 21 days
2